Asphalt paving guide

    Asphalt repair vs replace

    Most asphalt surfaces do not need a full tear out. Here is the decision matrix contractors actually use, so you do not get oversold and do not waste money fixing what is already failing.

    Decision matrix

    Condition Recommended action Why
    Hairline cracks under 1/4 inch Crack fill + sealcoat Cheap, restores look, prevents water intrusion.
    Cracks 1/4 to 1 inch, isolated areas Crack fill + patch + sealcoat Stop the spread before water gets to the base.
    Alligator cracking under 25% of surface Cut out and patch failed sections, then overlay Base is failing in spots. Surface fix is not enough.
    Alligator cracking over 25% of surface Full replacement Base is shot across enough area that an overlay will mirror the failure within 2 years.
    Surface 15-20+ years old, faded, multiple small failures Mill and overlay if base is sound Resets the surface without the cost of tear-out.
    Standing water, sinking spots Full replacement with regrade Drainage and base issues. Surface work only hides the problem.

    Frequently asked

    Want a number for your surface?

    Open the calculator